No-Drill Triangle Shower Caddy

Make Corners Work Harder – No-Drill Triangle Shower Caddy
Save Space with 3 Corner Shelves
Turn empty 90° corners into organized storage. Stack one, two, or all three tiers to keep bottles, skincare, and toothbrush cups neat and within reach.

Strong Adhesion, No Holes
Large adhesive pads + screw-tightening posts deliver a rock-solid hold on smooth walls—no drilling, no mess, easy removal for cleaning.

Upgraded ABS – Light Yet Durable
Thickened high-quality ABS is water-resistant and corrosion-resistant. It’s lighter than stainless steel, safer to handle, and kinder to rental walls.

Bigger, Broader, With Hooks
Widened guardrails increase capacity; side hooks hold razors, loofahs, or jewelry so small items never slip away.

Fast Drain, Dry & Clean
Hollow-slot base drains water quickly to keep your bathroom dry and bottles clean.

Tool-Free 4-Step Install
1) Attach the adhesive pad 2) Peel film 3) Align to the corner 4) Tighten the screw. Done in minutes.

Heavy-Duty Load Capacity
Each shelf supports up to 35 lb (≈ 15.9 kg) in load-bearing tests—room for large shampoo, body wash, and more.

Specifications:
| Material | Thickened ABS (water-resistant) |
| Design | Triangle corner rack for 90° walls |
| Install | Adhesive pads + screw-tightening, tool-free |
| Size (per shelf) | 30 cm × 21.5 cm × 15 cm, rail height 5.4 cm (11.81 × 8.46 × 5.91 in; 2.13 in height) |
| Max Load | 35 lb per tier (≈ 15.9 kg) |
| Color Options | Black / Gray |
| Best Surfaces | Glossy tile, marble, glass, metal – clean & dry |
| Not For | Rough/painted/powdery walls |
FAQ
1) Will it damage the wall?
No drilling. Adhesive pads stick firmly to smooth surfaces and can be removed with care.
2) How many shelves should I choose?
1-Tier for compact spaces; 2-Tier for couples; 3-Tier for families or heavy skincare users.
3) Can it hold large bottles?
Yes. Each tier is widened and tested to 35 lb—fits tall shampoo and body wash bottles.
4) Where does it work best?
Flat, non-porous surfaces (tile, marble, glass, metal). Avoid textured/painted walls.
5) How do I install?
Wipe wall dry → attach pad → peel film → align to 90° corner → tighten screws. Wait 12–24 h before heavy loading for best results.